4 planned generator projects are listed for Carbon County, WY in the EIA-860M inventory, with a combined stated nameplate of 3556.6 MW. By type: Wind 4.

Planned generators (EIA-860M)

ProjectTypeCapacityStatus (as reported)Planned onlineSource
Chokecherry and Sierra Madre Wind
Power Company of Wyoming LLC
Onshore Wind Turbine1303.2 MW(U) Under construction, less than or equal to 50 percent completeDec 2032EIA-860M planned generators, file 2026-07
Chokecherry and Sierra Madre Wind
Power Company of Wyoming LLC
Onshore Wind Turbine1693.8 MW(U) Under construction, less than or equal to 50 percent completeDec 2031EIA-860M planned generators, file 2026-07
Chokecherry and Sierra Madre Wind
Power Company of Wyoming LLC
Onshore Wind Turbine553.5 MW(U) Under construction, less than or equal to 50 percent completeDec 2033EIA-860M planned generators, file 2026-07
Two Rivers Wind Facility
Two Rivers Wind LLC
Onshore Wind Turbine6.1 MW(L) Regulatory approvals pending. Not under constructionOct 2028EIA-860M planned generators, file 2026-07
Want the list for one address? The full report measures distance from a street address to each mapped planned project. Get the Planned Power Project Report for $12.

Sources

Neither dataset records data centres or other electricity demand. Projects that are small, unreported or filed after the published dates do not appear.

QueueLedger reports public EIA and Lawrence Berkeley National Laboratory records of planned generators and interconnection requests near an address. It is not a utility, a developer, a regulator, an appraiser or a legal advisor, and a report says nothing about whether any project will be approved, built or cancelled.