Groundwork Register
EIA-860M file 2026-07
Planned power projects in Carbon, WY
4 planned generator projects are listed for Carbon County, WY in the EIA-860M inventory, with a combined stated nameplate of 3556.6 MW. By type: Wind 4.
Planned generators (EIA-860M)
| Project | Type | Capacity | Status (as reported) | Planned online | Source |
|---|---|---|---|---|---|
| Chokecherry and Sierra Madre Wind Power Company of Wyoming LLC | Onshore Wind Turbine | 1303.2 MW | (U) Under construction, less than or equal to 50 percent complete | Dec 2032 | EIA-860M planned generators, file 2026-07 |
| Chokecherry and Sierra Madre Wind Power Company of Wyoming LLC | Onshore Wind Turbine | 1693.8 MW | (U) Under construction, less than or equal to 50 percent complete | Dec 2031 | EIA-860M planned generators, file 2026-07 |
| Chokecherry and Sierra Madre Wind Power Company of Wyoming LLC | Onshore Wind Turbine | 553.5 MW | (U) Under construction, less than or equal to 50 percent complete | Dec 2033 | EIA-860M planned generators, file 2026-07 |
| Two Rivers Wind Facility Two Rivers Wind LLC | Onshore Wind Turbine | 6.1 MW | (L) Regulatory approvals pending. Not under construction | Oct 2028 | EIA-860M planned generators, file 2026-07 |
Want the list for one address? The full report measures distance from a street address to each mapped planned project. Get the Planned Power Project Report for $12.
Sources
- EIA-860M monthly generator inventory: https://www.eia.gov/electricity/data/eia860m/
- LBNL Queued Up interconnection queue data: https://emp.lbl.gov/queues
Neither dataset records data centres or other electricity demand. Projects that are small, unreported or filed after the published dates do not appear.
QueueLedger reports public EIA and Lawrence Berkeley National Laboratory records of planned generators and interconnection requests near an address. It is not a utility, a developer, a regulator, an appraiser or a legal advisor, and a report says nothing about whether any project will be approved, built or cancelled.