9 planned generator projects are listed for Haskell County, TX in the EIA-860M inventory, with a combined stated nameplate of 2483.5 MW. By type: Solar 5 · Battery storage 3 · Wind 1.

Planned generators (EIA-860M)

ProjectTypeCapacityStatus (as reported)Planned onlineSource
Quantum BESS
Intersect USA, LLC
Batteries422.4 MW(TS) Construction complete, but not yet in commercial operationSep 2026EIA-860M planned generators, file 2026-07
Quantum II BESS
Intersect USA, LLC
Batteries422.4 MW(TS) Construction complete, but not yet in commercial operationSep 2026EIA-860M planned generators, file 2026-07
Quantum Solar
Intersect USA, LLC
Solar Photovoltaic362.8 MW(TS) Construction complete, but not yet in commercial operationSep 2026EIA-860M planned generators, file 2026-07
Quantum II Solar
Intersect USA, LLC
Solar Photovoltaic362.8 MW(TS) Construction complete, but not yet in commercial operationSep 2026EIA-860M planned generators, file 2026-07
Briggs Solar, LLC
Intersect USA, LLC
Solar Photovoltaic305 MW(L) Regulatory approvals pending. Not under constructionDec 2027EIA-860M planned generators, file 2026-07
Throckmorton Wind
Throckmorton Wind, LLC
Onshore Wind Turbine225.6 MW(V) Under construction, more than 50 percent completeDec 2026EIA-860M planned generators, file 2026-07
Millers Branch Solar
Southern Power Co
Solar Photovoltaic180 MW(V) Under construction, more than 50 percent completeAug 2026EIA-860M planned generators, file 2026-07
Millers Branch Solar
Southern Power Co
Solar Photovoltaic132 MW(U) Under construction, less than or equal to 50 percent completeDec 2026EIA-860M planned generators, file 2026-07
Briggs Solar, LLC
Intersect USA, LLC
Batteries70.5 MW(L) Regulatory approvals pending. Not under constructionDec 2027EIA-860M planned generators, file 2026-07
Want the list for one address? The full report measures distance from a street address to each mapped planned project. Get the Planned Power Project Report for $12.

Sources

Neither dataset records data centres or other electricity demand. Projects that are small, unreported or filed after the published dates do not appear.

QueueLedger reports public EIA and Lawrence Berkeley National Laboratory records of planned generators and interconnection requests near an address. It is not a utility, a developer, a regulator, an appraiser or a legal advisor, and a report says nothing about whether any project will be approved, built or cancelled.