Planned power projects in Deaf Smith, TX

3 planned generator projects are listed for Deaf Smith County, TX in the EIA-860M inventory, with a combined stated nameplate of 1685.5 MW. By type: Solar 2 ยท Wind 1.

Planned generators (EIA-860M)

ProjectTypeCapacityStatus (as reported)Planned onlineSource
IP Roman Wind
Intersect USA, LLC
Onshore Wind Turbine670.5 MW(L) Regulatory approvals pending. Not under constructionSep 2028EIA-860M planned generators, file 2026-07
Renegade Solar Project (Dawn)
Renegade Renewables, LLC
Solar Photovoltaic515 MW(T) Regulatory approvals received. Not under constructionDec 2027EIA-860M planned generators, file 2026-07
IP Roman Solar
Intersect USA, LLC
Solar Photovoltaic500 MW(L) Regulatory approvals pending. Not under constructionJun 2028EIA-860M planned generators, file 2026-07
Want the list for one address? The full report measures distance from a street address to each mapped planned project. Get the Planned Power Project Report for $12.

Sources

Neither dataset records data centres or other electricity demand. Projects that are small, unreported or filed after the published dates do not appear.

QueueLedger reports public EIA and Lawrence Berkeley National Laboratory records of planned generators and interconnection requests near an address. It is not a utility, a developer, a regulator, an appraiser or a legal advisor, and a report says nothing about whether any project will be approved, built or cancelled.