6 planned generator projects are listed for Morrow County, OR in the EIA-860M inventory, with a combined stated nameplate of 2765 MW. By type: Battery storage 3 ยท Solar 3.

Planned generators (EIA-860M)

ProjectTypeCapacityStatus (as reported)Planned onlineSource
Sunstone Solar
Sunstone Solar, LLC
Batteries1200 MW(L) Regulatory approvals pending. Not under constructionDec 2027EIA-860M planned generators, file 2026-08
Sunstone Solar
Sunstone Solar, LLC
Solar Photovoltaic1200 MW(L) Regulatory approvals pending. Not under constructionDec 2027EIA-860M planned generators, file 2026-08
Wheatridge Optimization II
Wheatridge Optimization II, LLC
Solar Photovoltaic130 MW(U) Under construction, less than or equal to 50 percent completeDec 2027EIA-860M planned generators, file 2026-08
Wheatridge Optimization I
Wheatridge Optimization I, LLC
Solar Photovoltaic110 MW(U) Under construction, less than or equal to 50 percent completeDec 2027EIA-860M planned generators, file 2026-08
Wheatridge Optimization I
Wheatridge Optimization I, LLC
Batteries65 MW(U) Under construction, less than or equal to 50 percent completeDec 2027EIA-860M planned generators, file 2026-08
Wheatridge Optimization II
Wheatridge Optimization II, LLC
Batteries60 MW(U) Under construction, less than or equal to 50 percent completeDec 2027EIA-860M planned generators, file 2026-08
Want the list for one address? The full report measures distance from a street address to each mapped planned project. Get the Planned Power Project Report for $9.99.

Sources

Neither dataset records data centres or other electricity demand. Projects that are small, unreported or filed after the published dates do not appear.

QueueLedger reports public EIA and Lawrence Berkeley National Laboratory records of planned generators and interconnection requests near an address. It is not a utility, a developer, a regulator, an appraiser or a legal advisor, and a report says nothing about whether any project will be approved, built or cancelled.