Planned power projects in San Juan, NM
10 planned generator projects are listed for San Juan County, NM in the EIA-860M inventory, with a combined stated nameplate of 1729 MW. By type: Gas or other fossil 4 · Solar 3 · Battery storage 3.
Planned generators (EIA-860M)
| Project | Type | Capacity | Status (as reported) | Planned online | Source |
|---|---|---|---|---|---|
| Foxtail Flats Solar, LLC Foxtail Flats Solar, LLC | Solar Photovoltaic | 170 MW | (U) Under construction, less than or equal to 50 percent complete | Jun 2027 | EIA-860M planned generators, file 2026-07 |
| Four Mile Mesa Solar, LLC Four Mile Mesa Solar, LLC | Solar Photovoltaic | 100 MW | (U) Under construction, less than or equal to 50 percent complete | Jul 2027 | EIA-860M planned generators, file 2026-07 |
| Four Mile Mesa Solar, LLC Four Mile Mesa Solar, LLC | Batteries | 100 MW | (U) Under construction, less than or equal to 50 percent complete | Jul 2027 | EIA-860M planned generators, file 2026-07 |
| Rockmont Solar and Storage Project 201LC 8me LLC | Solar Photovoltaic | 100 MW | (L) Regulatory approvals pending. Not under construction | Dec 2027 | EIA-860M planned generators, file 2026-07 |
| Foxtail Flats Solar, LLC Foxtail Flats Solar, LLC | Batteries | 80 MW | (U) Under construction, less than or equal to 50 percent complete | May 2027 | EIA-860M planned generators, file 2026-07 |
| NTEC Gas Plant Navajo Transitional Energy Company | Natural Gas Fired Combustion Turbine | 1089 MW | (L) Regulatory approvals pending. Not under construction | Jun 2028 | EIA-860M planned generators, file 2026-07 |
| Rockmont Solar and Storage Project 201LC 8me LLC | Batteries | 30 MW | (L) Regulatory approvals pending. Not under construction | Dec 2027 | EIA-860M planned generators, file 2026-07 |
| Westside - (NM) Saddle Butte Energy Farmington, LLC | Natural Gas Internal Combustion Engine | 24 MW | (U) Under construction, less than or equal to 50 percent complete | Jan 2028 | EIA-860M planned generators, file 2026-07 |
| Westside - (NM) Saddle Butte Energy Farmington, LLC | Natural Gas Internal Combustion Engine | 20 MW | (U) Under construction, less than or equal to 50 percent complete | May 2028 | EIA-860M planned generators, file 2026-07 |
| Westside - (NM) Saddle Butte Energy Farmington, LLC | Natural Gas Internal Combustion Engine | 16 MW | (V) Under construction, more than 50 percent complete | Mar 2027 | EIA-860M planned generators, file 2026-07 |
Want the list for one address? The full report measures distance from a street address to each mapped planned project. Get the Planned Power Project Report for $12.
Sources
- EIA-860M monthly generator inventory: https://www.eia.gov/electricity/data/eia860m/
- LBNL Queued Up interconnection queue data: https://emp.lbl.gov/queues
Neither dataset records data centres or other electricity demand. Projects that are small, unreported or filed after the published dates do not appear.
QueueLedger reports public EIA and Lawrence Berkeley National Laboratory records of planned generators and interconnection requests near an address. It is not a utility, a developer, a regulator, an appraiser or a legal advisor, and a report says nothing about whether any project will be approved, built or cancelled.