10 planned generator projects are listed for San Juan County, NM in the EIA-860M inventory, with a combined stated nameplate of 1729 MW. By type: Gas or other fossil 4 · Solar 3 · Battery storage 3.

Planned generators (EIA-860M)

ProjectTypeCapacityStatus (as reported)Planned onlineSource
Foxtail Flats Solar, LLC
Foxtail Flats Solar, LLC
Solar Photovoltaic170 MW(U) Under construction, less than or equal to 50 percent completeJun 2027EIA-860M planned generators, file 2026-07
Four Mile Mesa Solar, LLC
Four Mile Mesa Solar, LLC
Solar Photovoltaic100 MW(U) Under construction, less than or equal to 50 percent completeJul 2027EIA-860M planned generators, file 2026-07
Four Mile Mesa Solar, LLC
Four Mile Mesa Solar, LLC
Batteries100 MW(U) Under construction, less than or equal to 50 percent completeJul 2027EIA-860M planned generators, file 2026-07
Rockmont Solar and Storage Project
201LC 8me LLC
Solar Photovoltaic100 MW(L) Regulatory approvals pending. Not under constructionDec 2027EIA-860M planned generators, file 2026-07
Foxtail Flats Solar, LLC
Foxtail Flats Solar, LLC
Batteries80 MW(U) Under construction, less than or equal to 50 percent completeMay 2027EIA-860M planned generators, file 2026-07
NTEC Gas Plant
Navajo Transitional Energy Company
Natural Gas Fired Combustion Turbine1089 MW(L) Regulatory approvals pending. Not under constructionJun 2028EIA-860M planned generators, file 2026-07
Rockmont Solar and Storage Project
201LC 8me LLC
Batteries30 MW(L) Regulatory approvals pending. Not under constructionDec 2027EIA-860M planned generators, file 2026-07
Westside - (NM)
Saddle Butte Energy Farmington, LLC
Natural Gas Internal Combustion Engine24 MW(U) Under construction, less than or equal to 50 percent completeJan 2028EIA-860M planned generators, file 2026-07
Westside - (NM)
Saddle Butte Energy Farmington, LLC
Natural Gas Internal Combustion Engine20 MW(U) Under construction, less than or equal to 50 percent completeMay 2028EIA-860M planned generators, file 2026-07
Westside - (NM)
Saddle Butte Energy Farmington, LLC
Natural Gas Internal Combustion Engine16 MW(V) Under construction, more than 50 percent completeMar 2027EIA-860M planned generators, file 2026-07
Want the list for one address? The full report measures distance from a street address to each mapped planned project. Get the Planned Power Project Report for $12.

Sources

Neither dataset records data centres or other electricity demand. Projects that are small, unreported or filed after the published dates do not appear.

QueueLedger reports public EIA and Lawrence Berkeley National Laboratory records of planned generators and interconnection requests near an address. It is not a utility, a developer, a regulator, an appraiser or a legal advisor, and a report says nothing about whether any project will be approved, built or cancelled.